Shell and roof completed |
Inside raw look, notice huge gaps in between the logs |
Applying borate based solution to treat logs |
Preparing logs for milling – cutting at 20ft lengths |
Heavy duty forklift (blue) was used for stacking logs and hauling logs / lumber around |
Milling logs on a sawmill; materials used for door and window bucks
|
Summer 2022: all house is chinked (mortar based mix in between the logs) |
Closer look |
No responses yet